Public transport companies operate critical infrastructure around the clock – and place correspondingly high demands on fiber optic cable systems. The Berlin Transport Companies (BVG) have established binding standards in their guidelines for the planning and implementation of ITK infrastructure that go far beyond general DIN and VDE standards. Anyone who wants to become a contractor in this environment must fully comply with operator-specific specifications regarding cable types, splicing quality, measurement technology, and acceptance documentation. The GRAEF Group supports such projects from planning to measurement handover.
Cable specification: Approved types, materials and connectors
The requirements begin at the fiber level. For all connections within metro stations, tunnels, and operational buildings, only single-mode outdoor cables according to ITU-T G.652 are permitted. The attenuation coefficient must not exceed 0.22 dB/km at 1550 nm, the maximum pulling force must reach at least 3,000 N, and the cable must be water-tight both longitudinally and transversely. The outer jacket must be made of flame-retardant, halogen-free, and strain-rupture resistant material – with a green outer color (RAL 6001) and marking. Fluor-doped fibers are generally not permitted. For special applications, such as in control rooms, OM4 multimode fibers with a blue outer jacket (RAL 5017) can be used – however, this requires the written approval of the system administrator.
The E2000-HRL plug is the standard plug according to IEC 61754-15 with a return-flow damping of at least 85 dB and a typical insertion damping of 0.1 dB; additional adapters are not permitted. All cables and components to be used must be approved in writing by the customer before use – the corresponding data sheets are part of the purchase documentation. A fiber rack of the Gf-Vt64SU (ETSI) series with IP54 protection class is used as the distribution system, which can accommodate up to 32 splice and patch boxes, must be fully grounded and requires a cable reserve of at least 15 m.
Installation in ongoing operation: tunnels, fire protection and earthing
Installation work in the danger zone of railway lines is permitted exclusively during the nighttime operating break of the subway – usually with installation vehicles specially provided for the task. When pulling in with a cable winch, the maximum pulling speed is 45 m/min; the winch must have an automatic shutdown device that automatically triggers when the permissible pulling force is exceeded. For Public-sector projects This means that every installation must be timed to coincide with operational requirements, in order to rule out any outages or disruptions to traffic operations.
Every new wall or ceiling conduit must be sealed immediately after the cable installation with an S90 fire protection sleeve – any short-term opening is not permitted. All metal components must be grounded according to the BVG-specific „3-Ground System U-Bahn“; the protective conductor (H07Z-U 16 mm² gn/ge) is connected directly to the potential compensation rail. In Fvt rooms, circular grid strips with a width of 400 mm must be installed; the cable load must not exceed 60% of the maximum load to ensure sufficient capacity for future expansions. Patchcords must be routed separately from all other cable types on a specially designed guide.
Fusion splicing: Tight tolerances, certified technicians
For all fusion splicing connections of single-mode fibers, only 3-axis fusion devices with precision core centering according to the PAS or LID method are approved; V-nut fusion devices are generally excluded. The maximum allowable attenuation value per single fusion is 0.1 dB – if this limit value cannot be met after three fusion attempts, the client must be informed immediately. For the mechanical protection of all connections, only crimping technology is permitted. Installation companies must provide valid FIST installation certificates for all technicians employed upon submission of the quote. Splitting of optical waveguides At this level of quality, not only the right equipment is required, but also provenly certified professional staff – a standard that the GRAEF Group continuously ensures for its installers.
OTDR measurement and documentation of results
The measurement of all fibers is performed using bidirectional OTDR measurement at 1310 nm and 1550 nm in accordance with EN 18800 method 303 (corresponding to DIN VDE 0472 Part 251) or IEC 7931. For E2000-HRL plug connections, a maximum total insertion loss value – including splice loss – of 0.3 dB is stated in the OTDR measurement. All measurement logs for splice, level, and OTDR must be submitted in both written and digital form in the Telcordia-SR-4731 standard format (sor file); valid calibration certificates for all measuring equipment used must also be submitted upon submission of the offer. The OTDR measurement This is not only a technical control instrument, but also a contractually required component of the purchase documentation. All installed cables, racks, and components must be subsequently recorded and documented in the operator’s inventory plans.
GRAEF Group – a competent partner for demanding fiber optic infrastructure projects
Whether new installation in accordance with operator guidelines, expansion of existing fiber optic networks, or OTDR testing with full documentation: The GRAEF Group is familiar with the technical and formal requirements of public infrastructure operators and supports your project from the initial tender to the handover. Nationwide, from consultation to maintenance.